Power quality measurement equipment used during electrical diagnostics

TES Planning Tool

Downtime Exposure Estimator

A plain planning estimate for substation and transformer downtime risk. No locked results, no scare tactics, and no substitute for field testing.

Estimate Your Exposure

Use rough operational inputs. The output is directional and should help frame a maintenance conversation, not replace engineering judgement.

assets

Range: 1 to 40 assets

TZS

Range: TZS 100,000 to TZS 50,000,000

hours

Range: 1 to 72 hours

years

Range: 1 to 35 years

/100

Range: 0 to 100 /100

Assumptions Used

Output type

Directional estimate

Failure model

Exposure range, not prediction

Best use

Planning and prioritisation

This model intentionally avoids fake precision. A formal TES assessment would use site observations, load data, thermography, oil analysis, protection history, operating environment, and maintenance records.

Optional Copy

This is optional. The result above is not locked. Use this only if you want a copy or want TES to follow up.